Triple
T26752439
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shuttle Loop |
E674576
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steel roller coaster design |
C4765
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steel roller coaster design Context triple: [Shuttle Loop, instanceOf, steel roller coaster design]
-
A.
steel roller coaster
chosen
A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
-
B.
steel-wood roller coaster
A steel-wood roller coaster is a hybrid amusement ride that combines a traditional wooden support structure with steel track to deliver a smoother yet classic-feeling coaster experience.
-
C.
roller coaster engineer
A roller coaster engineer designs, analyzes, and oversees the construction and maintenance of roller coasters to ensure they deliver thrilling yet safe ride experiences.
-
D.
roller coaster concept
A roller coaster concept is a high-level design blueprint that defines the ride’s theme, layout, key elements, and overall experience before detailed engineering and construction begin.
-
E.
stand-up roller coaster
A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eecda6e9dc81908452fab3ba17ed9b |
completed | April 27, 2026, 2:44 a.m. |
Created at: April 27, 2026, 3:54 a.m.