Triple

T2669918
Position Surface form Disambiguated ID Type / Status
Subject Eko Atlantic E55724 entity
Predicate instanceOf P0 FINISHED
Object reclaimed land project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reclaimed land project
Context triple: [Eko Atlantic, instanceOf, reclaimed land project]
  • A. restored wetland
    A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
  • B. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. former gravel pit
    A former gravel pit is a previously excavated site where gravel was extracted, now typically abandoned, reclaimed, or repurposed for new land uses such as recreation, habitat restoration, or development.
  • D. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • E. earthwork
    An earthwork is a large-scale construction or artistic formation made by shaping, moving, or arranging soil, rock, and other natural materials in the landscape.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e54de48190be708cd1cf8be073 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:54 p.m.