Triple

T26692152
Position Surface form Disambiguated ID Type / Status
Subject Abbe diffraction limit E672914 entity
Predicate instanceOf P0 FINISHED
Object resolution criterion C12602 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: resolution criterion
Context triple: [Abbe diffraction limit, instanceOf, resolution criterion]
  • A. resolution
    Resolution is the process or outcome of resolving a problem, conflict, or ambiguity by reaching a clear, definitive, and often agreed-upon state or decision.
  • B. criterion for convergence
    A criterion for convergence is a specific test or condition used to determine whether a given sequence or series approaches a finite limit as its index or number of terms increases.
  • C. physical criterion chosen
    A physical criterion is a measurable, objective standard based on physical properties or phenomena used to evaluate, classify, or distinguish objects, systems, or conditions.
  • D. criterion in numerical analysis
    A criterion in numerical analysis is a quantitative condition or rule—such as a tolerance, convergence test, or stopping condition—used to assess the accuracy, stability, or termination of an algorithm or computational method.
  • E. decision instrument
    A decision instrument is a structured tool or framework used to systematically evaluate options and guide the selection of an optimal course of action based on defined criteria.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eecda2066c8190a344218afa5e89c1 completed April 27, 2026, 2:44 a.m.
Created at: April 27, 2026, 3:26 a.m.