Triple
T26653201
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Siel (sluice) facilities |
E666423
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood protection infrastructure |
C18289
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood protection infrastructure Context triple: [Siel (sluice) facilities, instanceOf, flood protection infrastructure]
-
A.
flood control facility
chosen
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
-
B.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
C.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
D.
flood risk reduction program
A flood risk reduction program is an organized set of policies, projects, and practices designed to lessen the likelihood and impacts of flooding on people, property, and the environment.
-
E.
movable flood barrier
A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee9cf8c7188190b9b00270a8a89164 |
completed | April 26, 2026, 11:17 p.m. |
Created at: April 27, 2026, 2:34 a.m.