Triple

T2664412
Position Surface form Disambiguated ID Type / Status
Subject Yellow Card Scheme E55600 entity
Predicate instanceOf P0 FINISHED
Object adverse event reporting system C3767 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: adverse event reporting system
Context triple: [Yellow Card Scheme, instanceOf, adverse event reporting system]
  • A. public warning system
    A public warning system is an organized infrastructure of technologies, protocols, and communication channels designed to rapidly alert and inform the public about imminent or ongoing emergencies and hazards.
  • B. emergency management agency
    An emergency management agency is an organization responsible for preparing for, coordinating, and responding to natural or human-made disasters to protect people, property, and the environment.
  • C. auditing system
    An auditing system is a software component that systematically collects, records, and analyzes events or transactions within a system to ensure accountability, traceability, and compliance with policies or regulations.
  • D. regulatory reporting platform chosen
    A regulatory reporting platform is a system that collects, validates, and transforms organizational data into compliant reports for submission to regulators according to applicable rules and deadlines.
  • E. environmental health risk assessment program
    An environmental health risk assessment program systematically evaluates potential adverse health effects from environmental hazards by analyzing exposure, toxicity, and population vulnerability to inform risk management decisions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e54de48190be708cd1cf8be073 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:54 p.m.