Triple

T2664272
Position Surface form Disambiguated ID Type / Status
Subject David T. Nederlander E55596 entity
Predicate instanceOf P0 FINISHED
Object theatrical impresario C2838 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: theatrical impresario
Context triple: [David T. Nederlander, instanceOf, theatrical impresario]
  • A. theatrical producer
    A theatrical producer is the individual responsible for overseeing and coordinating all financial, logistical, and creative aspects of a stage production, from development and funding through casting, rehearsals, and performance.
  • B. theatre producer chosen
    A theatre producer is the individual responsible for overseeing and coordinating all financial, logistical, and organizational aspects of a stage production, from securing rights and funding to assembling the creative team and managing the show’s run.
  • C. theater owner
    A theater owner is an individual or entity that possesses and manages a performance venue, overseeing its operations, programming, finances, and maintenance.
  • D. Broadway theater producer
    A Broadway theater producer is a professional who secures financing, assembles creative and technical teams, oversees production logistics, and manages the business and artistic aspects of bringing a stage show to Broadway audiences.
  • E. theatre director
    A theatre director is the creative leader who interprets a script and coordinates actors, designers, and technical staff to shape the overall vision and execution of a stage production.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49e54de48190be708cd1cf8be073 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:54 p.m.