Triple
T26616101
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | AA Diploma |
E668063
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | architecture qualification |
C17480
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: architecture qualification Context triple: [AA Diploma, instanceOf, architecture qualification]
-
A.
architectural qualification
chosen
Architectural qualification is the process of evaluating and certifying that a building’s design, materials, and systems meet specified performance, safety, regulatory, and functional requirements.
-
B.
engineering qualification
An engineering qualification is a formal credential or certification that verifies an individual's technical knowledge, skills, and competence to practice in a specific engineering discipline.
-
C.
architecture work
An architecture work is a tangible or digital artifact that represents the design, planning, or documentation of a built environment, such as drawings, models, specifications, or design narratives.
-
D.
architectural design
Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
-
E.
architectural development
Architectural development is the iterative process of designing, refining, and evolving a system’s structure to meet functional, technical, and stakeholder requirements over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee9cfe16088190a3dddd68e3c7b1ea |
completed | April 26, 2026, 11:17 p.m. |
Created at: April 27, 2026, 2:18 a.m.