Triple

T26600821
Position Surface form Disambiguated ID Type / Status
Subject Republic Mine pit lake E667627 entity
Predicate instanceOf P0 FINISHED
Object former open-pit mine C28507 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former open-pit mine
Context triple: [Republic Mine pit lake, instanceOf, former open-pit mine]
  • A. former quarry
    A former quarry is a previously excavated open-pit site where stone, minerals, or other materials were extracted, now typically abandoned, repurposed, or undergoing natural or managed reclamation.
  • B. former mine chosen
    A former mine is a site where mineral extraction has ceased, leaving behind altered landscapes, structures, and potential environmental legacies from past mining activities.
  • C. open-pit copper mine
    An open-pit copper mine is a large-scale surface excavation where overburden and rock are removed in benches to access and extract copper-bearing ore using heavy machinery.
  • D. open-pit diamond mine
    An open-pit diamond mine is a large, terraced surface excavation where overburden and rock are removed in successive benches to expose and extract diamond-bearing ore.
  • E. former gravel pit
    A former gravel pit is a previously excavated site where gravel was extracted, now typically abandoned, reclaimed, or repurposed for new land uses such as recreation, habitat restoration, or development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9cfd20348190bb1255d2603efb7a completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:12 a.m.