Triple

T26584590
Position Surface form Disambiguated ID Type / Status
Subject Shock and Awe E667173 entity
Predicate instanceOf P0 FINISHED
Object operation phase C180 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: operation phase
Context triple: [Shock and Awe, instanceOf, operation phase]
  • A. military campaign phase chosen
    A military campaign phase is a distinct, time-bounded segment of a broader military operation characterized by specific objectives, actions, and resource allocations that contribute to the overall strategic goal.
  • B. execution
    Execution is the process by which a planned set of actions or instructions is carried out to achieve a specific outcome or fulfill a defined intent.
  • C. military training phase
    A military training phase is a distinct, time-bounded period in a service member’s preparation program focused on achieving specific physical, tactical, and psychological readiness objectives.
  • D. period of preparation
    A period of preparation is a span of time intentionally set aside to gather resources, build skills, and organize plans in advance of a forthcoming event or undertaking.
  • E. building alteration phase
    The building alteration phase is the period in a building’s lifecycle during which modifications, renovations, or upgrades are planned and executed to change its structure, systems, or use without fully demolishing it.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee9cfb7e548190b60a9031182f5a7e completed April 26, 2026, 11:17 p.m.
Created at: April 27, 2026, 2:05 a.m.