Triple
T2656348
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | E-ZPass |
E54620
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electronic toll collection system |
C1687
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electronic toll collection system Context triple: [E-ZPass, instanceOf, electronic toll collection system]
-
A.
high-occupancy toll lanes
High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
-
B.
toll road
A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
-
C.
toll highway
A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
-
D.
fare payment system
chosen
A fare payment system is a coordinated set of processes and technologies that calculates, collects, and validates payments for transportation services from passengers.
-
E.
contactless smart card fare system
A contactless smart card fare system is an electronic payment and access control solution for public transportation that uses proximity cards or devices to automatically deduct fares and manage rider accounts when tapped on compatible readers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e028948190b97e01d73548b1d9 |
completed | March 6, 2026, 9:40 p.m. |
Created at: March 6, 2026, 9:53 p.m.