Triple
T26551313
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 梅花祭 |
E671684
|
entity |
| Predicate | 開催時期 |
P47823
|
FINISHED |
| Object | 梅の花の見頃の時期 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 梅の花の見頃の時期 | Statement: [梅花祭, 開催時期, 梅の花の見頃の時期]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: 開催時期 Context triple: [梅花祭, 開催時期, 梅の花の見頃の時期]
-
A.
phase1OpeningDate
Indicates the date on which the first phase of a project, development, or initiative is officially opened or begins operation.
-
B.
launchPeriod
chosen
Indicates the time span during which a launch or deployment activity occurs or is valid.
-
C.
rerAOpeningDate
Indicates the date on which something (such as a facility, service, or route) is opened again after having been closed.
-
D.
operatedDuring
Indicates that an action, process, or system was functioning or in operation throughout a specified time period or event.
-
E.
preparationPeriod
Indicates the time span allocated before an event or action during which necessary preparations are made.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb32163f08190af5f81282738e27a |
completed | April 27, 2026, 12:51 a.m. |
| NER | Named-entity recognition | batch_69f614624c80819084f6febf57f86828 |
completed | May 2, 2026, 3:12 p.m. |
| PD | Predicate disambiguation | batch_69f60b89cc048190a9feb24466006be0 |
completed | May 2, 2026, 2:34 p.m. |
Created at: April 27, 2026, 1:47 a.m.