Triple
T26526211
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Portland urban growth boundary |
E670694
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban growth boundary |
C8912
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban growth boundary Context triple: [Portland urban growth boundary, instanceOf, urban growth boundary]
-
A.
urban enclosure
An urban enclosure is a defined spatial area within a city—such as a courtyard, plaza, or block—whose physical and social boundaries create a sense of contained, cohesive public or semi-public environment.
-
B.
city limit
A city limit is the legally defined boundary that marks the geographic extent and jurisdictional edge of a city.
-
C.
urban administrative area
An urban administrative area is a geographically defined part of a city or town governed by specific local authorities responsible for public services, regulation, and planning within its boundaries.
-
D.
land-use control
chosen
Land-use control is the set of legal and administrative mechanisms by which governments and authorities regulate how land may be developed, used, and conserved within a given jurisdiction.
-
E.
urban service area
An urban service area is a designated geographic zone within or around a city where public services and infrastructure—such as water, sewer, transportation, and emergency response—are planned, provided, and managed in a coordinated manner.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb31ea1e08190b9ff43cf9bc25bf8 |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 1:32 a.m.