Triple
T26523992
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Midcontinent Independent System Operator region |
E670635
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transmission system footprint |
C51701
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transmission system footprint Context triple: [Midcontinent Independent System Operator region, instanceOf, transmission system footprint]
-
A.
modular load-carrying system
A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
-
B.
tunneling system
A tunneling system is a conceptual framework or infrastructure that enables data, particles, or signals to pass through barriers or intermediate layers via a protected or probabilistic pathway without directly traversing the intervening space in a conventional manner.
-
C.
electric transport system
An electric transport system is an integrated network of vehicles, infrastructure, and control technologies that enables the movement of people or goods using electricity as the primary energy source.
-
D.
continuous transport system
A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
-
E.
transponder-based toll system
A transponder-based toll system is an automated electronic toll collection method where vehicles equipped with small radio-frequency devices are detected and charged as they pass through toll points without stopping.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeb31ea1e08190b9ff43cf9bc25bf8 |
completed | April 27, 2026, 12:51 a.m. |
Created at: April 27, 2026, 1:30 a.m.