Triple

T26457263
Position Surface form Disambiguated ID Type / Status
Subject Jurong Port E665528 entity
Predicate instanceOf P0 FINISHED
Object multipurpose port C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multipurpose port
Context triple: [Jurong Port, instanceOf, multipurpose port]
  • A. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • B. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • C. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • D. docking port
    A docking port is a specialized interface on a spacecraft or space station that enables secure physical connection, alignment, and transfer of power, data, and crew or cargo between two vehicles.
  • E. international port
    An international port is a major maritime facility equipped to handle the arrival, departure, and transfer of cargo and passengers between countries, integrating customs, logistics, and transportation infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883e812c8190a9b5a9cdb87fee5e completed April 26, 2026, 9:48 p.m.
Created at: April 27, 2026, 12:09 a.m.