Triple

T26442939
Position Surface form Disambiguated ID Type / Status
Subject North Vietnamese Army positions in Laos E665136 entity
Predicate instanceOf P0 FINISHED
Object logistical infrastructure C45755 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: logistical infrastructure
Context triple: [North Vietnamese Army positions in Laos, instanceOf, logistical infrastructure]
  • A. logistical operation
    A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
  • B. logistics network
    A logistics network is an interconnected system of facilities, transportation modes, and information flows designed to efficiently move goods from origin to destination while optimizing cost, time, and service quality.
  • C. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • D. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • E. military logistics site chosen
    A military logistics site is a secured facility where armed forces coordinate, store, and distribute supplies, equipment, and transportation resources to support operations and readiness.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883c851881909e2ab04efbb3c5fe completed April 26, 2026, 9:48 p.m.
Created at: April 27, 2026, midnight