Triple

T2642478
Position Surface form Disambiguated ID Type / Status
Subject Alfa Pendular E62902 entity
Predicate instanceOf P0 FINISHED
Object tilting train service C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tilting train service
Context triple: [Alfa Pendular, instanceOf, tilting train service]
  • A. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • B. named train
    A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
  • C. passenger train
    A passenger train is a rail vehicle or series of connected vehicles designed to transport people and their luggage between stations along a fixed route and schedule.
  • D. auto ferry train
    An auto ferry train is a specialized rail service designed to transport passengers along with their vehicles—such as cars, motorcycles, and small trucks—across long distances or through otherwise impassable routes like tunnels or mountainous regions.
  • E. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3f2dcc819082df80f5e032f690 completed March 6, 2026, 9:50 p.m.
Created at: March 6, 2026, 9:53 p.m.