Triple

T26396663
Position Surface form Disambiguated ID Type / Status
Subject Csorna E663579 entity
Predicate railwayConnection P848 FINISHED
Object Győr–Sopron railway line
The Győr–Sopron railway line is a key regional rail route in northwestern Hungary that connects the city of Győr with the border town of Sopron, serving as an important passenger and freight corridor.
E1722835 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Győr–Sopron railway line | Statement: [Csorna, railwayConnection, Győr–Sopron railway line]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Győr–Sopron railway line
Triple: [Csorna, railwayConnection, Győr–Sopron railway line]
Generated description
The Győr–Sopron railway line is a key regional rail route in northwestern Hungary that connects the city of Győr with the border town of Sopron, serving as an important passenger and freight corridor.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee883823988190b418b111be28a44a completed April 26, 2026, 9:48 p.m.
NER Named-entity recognition batch_69f610c3adc481908a3df0856345498f completed May 2, 2026, 2:57 p.m.
NED1 Entity disambiguation (via context triple) batch_6a119a893a1c8190871ba8755b313373 completed May 23, 2026, 12:16 p.m.
NEDg Description generation batch_6a119c71d29c81909bc7875bad89ce29 completed May 23, 2026, 12:24 p.m.
NED2 Entity disambiguation (via description) batch_6a119d54117c81909ec9709271172d7b completed May 23, 2026, 12:28 p.m.
Created at: April 26, 2026, 11:29 p.m.