Triple
T26335630
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bridge and Door |
E662510
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | work by Georg Simmel |
C9028
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: work by Georg Simmel Context triple: [Bridge and Door, instanceOf, work by Georg Simmel]
-
A.
work of social theory
A work of social theory is a systematic, conceptually driven analysis that seeks to explain, interpret, or critique the structures, dynamics, and meanings of social life.
-
B.
work by Arthur Schopenhauer
A work by Arthur Schopenhauer is any philosophical text, essay, or publication authored by Schopenhauer that articulates his views on metaphysics, ethics, aesthetics, or human existence.
-
C.
sociology book
chosen
A sociology book is a written work that systematically explores human societies, social behavior, institutions, and cultural patterns using sociological theories and research.
-
D.
منصب اجتماعي
المنصب الاجتماعي هو موقع أو دور معترف به داخل البنية الاجتماعية يحدد مكانة الفرد وحقوقه وواجباته وعلاقاته بالآخرين.
-
E.
work of Friedrich Nietzsche
The work of Friedrich Nietzsche comprises a body of philosophical writings that challenge traditional morality, religion, and metaphysics through concepts like the will to power, the death of God, and the revaluation of values, often expressed in a provocative, aphoristic style.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee812f32748190871d970c4e2a8ddf |
completed | April 26, 2026, 9:18 p.m. |
Created at: April 26, 2026, 10:36 p.m.