Triple
T2629612
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Clang |
E59601
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | LLVM subproject |
C1477
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: LLVM subproject Context triple: [Clang, instanceOf, LLVM subproject]
-
A.
OSS branch
An OSS branch is a parallel line of development in an open-source software repository where changes can be made, tested, and reviewed independently before being merged into the main codebase.
-
B.
compiler
A compiler is a software tool that translates source code written in a high-level programming language into a lower-level target language, typically machine code or bytecode, while performing analysis and optimizations.
-
C.
side project
A side project is a self-initiated, typically smaller-scale endeavor pursued alongside primary work or responsibilities to explore interests, develop skills, or test new ideas.
-
D.
programming language implementation
A programming language implementation is the concrete realization of a language’s specification, including its compiler or interpreter, runtime system, and associated tools that translate and execute programs written in that language.
-
E.
compiler system
chosen
A compiler system is a software toolchain that translates high-level source code into lower-level machine or intermediate code, performing analysis, optimization, and code generation to produce an executable program.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4ac8596c8190b34997e73d9e991c |
completed | March 6, 2026, 9:44 p.m. |
Created at: March 6, 2026, 9:50 p.m.