Triple

T2622097
Position Surface form Disambiguated ID Type / Status
Subject Expedition Everest – Legend of the Forbidden Mountain E59031 entity
Predicate instanceOf P0 FINISHED
Object story-driven roller coaster C4775 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: story-driven roller coaster
Context triple: [Expedition Everest – Legend of the Forbidden Mountain, instanceOf, story-driven roller coaster]
  • A. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • B. roller coaster variant chosen
    A roller coaster variant is a specific type or design of roller coaster that differs in track layout, ride mechanics, theming, or rider experience from standard models.
  • C. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • D. thrill ride
    A thrill ride is an amusement attraction designed to provoke strong physical sensations and excitement through high speeds, sudden movements, and dramatic heights or drops.
  • E. backward roller coaster
    A backward roller coaster is an amusement ride where the train primarily travels in reverse along the track, creating disorienting and intensified sensations of speed, drops, and turns.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac558388190962492cd2e1b0ce6 completed March 6, 2026, 9:44 p.m.
Created at: March 6, 2026, 9:50 p.m.