Triple
T26210326
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Manasamangal |
E655470
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | medieval Bengali narrative poem cycle |
C12780
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: medieval Bengali narrative poem cycle Context triple: [Manasamangal, instanceOf, medieval Bengali narrative poem cycle]
-
A.
Meitei epic
A Meitei epic is a long, narrative literary or oral work from the Meitei (Manipuri) cultural tradition that recounts heroic deeds, mythological events, and foundational legends of the Meitei people.
-
B.
historical novel cycle
A historical novel cycle is a series of interrelated historical fiction works that share a common setting, characters, or overarching narrative across multiple volumes.
-
C.
medieval literary work
chosen
A medieval literary work is a written or orally transmitted text from roughly the 5th to the 15th century that reflects the cultural, religious, and social contexts of the Middle Ages through genres such as epics, romances, hagiographies, chronicles, and lyric poetry.
-
D.
Middle English narrative poem
A Middle English narrative poem is a verse composition written in the Middle English language that tells a structured story, often involving adventure, romance, morality, or religious themes.
-
E.
tapestry cycle
A tapestry cycle is a series of related woven hangings designed and produced as a coordinated group to depict a continuous narrative, theme, or set of events.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5b49adb4819086545280d4ef6337 |
completed | April 26, 2026, 6:36 p.m. |
Created at: April 26, 2026, 8:52 p.m.