Triple

T2620172
Position Surface form Disambiguated ID Type / Status
Subject John McShain E58988 entity
Predicate instanceOf P0 FINISHED
Object building contractor C8767 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: building contractor
Context triple: [John McShain, instanceOf, building contractor]
  • A. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • B. carpenter
    A carpenter is a skilled tradesperson who constructs, installs, and repairs structures and fixtures made primarily of wood and related materials.
  • C. construction material
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • D. builder chosen
    A builder is an entity responsible for constructing or assembling complex objects or structures step-by-step, often following a specified plan or design.
  • E. architect
    An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac444dc819099614e534dd6021f completed March 6, 2026, 9:44 p.m.
Created at: March 6, 2026, 9:50 p.m.