Triple
T26178709
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | PZL.49 Miś |
E654611
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | projected military aircraft |
C16232
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: projected military aircraft Context triple: [PZL.49 Miś, instanceOf, projected military aircraft]
-
A.
military aircraft
A military aircraft is a powered flying vehicle specifically designed, equipped, and operated by armed forces to conduct combat, support, reconnaissance, or training missions in defense and warfare operations.
-
B.
bomber aircraft project
A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
-
C.
jet-powered aircraft
A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
-
D.
unbuilt aircraft project
chosen
An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
-
E.
fighter aircraft
A fighter aircraft is a fast, highly maneuverable military airplane designed primarily to secure air superiority by engaging and destroying enemy aircraft in combat.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5b45873c81909499203612d05d07 |
completed | April 26, 2026, 6:36 p.m. |
Created at: April 26, 2026, 8:39 p.m.