Triple

T26170741
Position Surface form Disambiguated ID Type / Status
Subject Coleman Report E654394 entity
Predicate instanceOf P0 FINISHED
Object education study C45287 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: education study
Context triple: [Coleman Report, instanceOf, education study]
  • A. educational study chosen
    An educational study is a systematic investigation designed to examine, evaluate, and improve teaching methods, learning processes, educational policies, or academic outcomes within formal or informal learning environments.
  • B. study
    A study is a structured investigation or examination of a subject or phenomenon aimed at discovering, interpreting, or revising facts, theories, or applications.
  • C. education portal
    An education portal is an online platform that centralizes access to learning resources, courses, assessments, and communication tools for students, educators, and administrators.
  • D. education approach
    An education approach is a coherent set of principles, methods, and strategies that guides how teaching and learning are designed, delivered, and evaluated.
  • E. education law
    Education law is the body of statutes, regulations, and case law that governs how educational institutions operate, the rights and responsibilities of students, parents, teachers, and administrators, and the allocation and oversight of educational resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b44391c81908bdbd8813ba9aa99 completed April 26, 2026, 6:36 p.m.
Created at: April 26, 2026, 8:35 p.m.