Triple

T26164118
Position Surface form Disambiguated ID Type / Status
Subject Vickers Type 271 design studies E654200 entity
Predicate instanceOf P0 FINISHED
Object bomber aircraft design study C38405 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bomber aircraft design study
Context triple: [Vickers Type 271 design studies, instanceOf, bomber aircraft design study]
  • A. bomber aircraft project
    A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
  • B. aircraft design study chosen
    An aircraft design study is a systematic analysis and exploration of aircraft configurations, technologies, and performance parameters to determine feasible concepts that meet specified mission, safety, cost, and regulatory requirements.
  • C. bomber aircraft variant
    A bomber aircraft variant is a specific version of a bomber designed or modified to perform particular roles, missions, or operate under distinct performance, payload, or technological configurations.
  • D. military bomber
    A military bomber is a combat aircraft designed to deliver large quantities of explosive ordnance over strategic or tactical targets, often from medium to long ranges.
  • E. prototype bomber aircraft
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5b44391c81908bdbd8813ba9aa99 completed April 26, 2026, 6:36 p.m.
Created at: April 26, 2026, 8:31 p.m.