Triple
T26146291
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | University of Minnesota Transitway |
E659674
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bicycle corridor |
C646
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bicycle corridor Context triple: [University of Minnesota Transitway, instanceOf, bicycle corridor]
-
A.
neighborhood corridor
A neighborhood corridor is a linear, mixed-use area within a community that concentrates housing, shops, services, and transportation along a primary street to support walkability and local activity.
-
B.
rail trail
chosen
A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
-
C.
road bicycle
A road bicycle is a lightweight, narrow-tired bicycle designed primarily for fast travel on paved roads, featuring drop handlebars and multiple gears for efficient long-distance riding.
-
D.
equestrian trail
An equestrian trail is a designated path or route specifically designed and maintained for horseback riding, often featuring suitable terrain, signage, and accommodations for horses and riders.
-
E.
cycling track
A cycling track is a designated, often oval-shaped course or lane specifically designed and constructed for bicycle riding, training, and racing.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bc496a88190af7deb7ab5e081de |
completed | April 26, 2026, 6:39 p.m. |
Created at: April 26, 2026, 8:22 p.m.