Triple
T26093019
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Blohm & Voss BV 237 |
E658178
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ground-attack aircraft project |
C16232
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ground-attack aircraft project Context triple: [Blohm & Voss BV 237, instanceOf, ground-attack aircraft project]
-
A.
bomber aircraft project
A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
-
B.
aerial bomb
An aerial bomb is an explosive weapon designed to be dropped from aircraft to detonate on or near a target, causing destructive blast, fragmentation, or specialized effects.
-
C.
unbuilt aircraft project
chosen
An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
-
D.
prototype bomber aircraft
A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
-
E.
anti-submarine warfare aircraft program
A coordinated initiative to design, develop, acquire, and sustain specialized aircraft, systems, and capabilities dedicated to detecting, tracking, and neutralizing submarine threats.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ee5bbfc4d08190a1b206d0ac3a1e8d |
completed | April 26, 2026, 6:38 p.m. |
Created at: April 26, 2026, 7:48 p.m.