Triple

T26093019
Position Surface form Disambiguated ID Type / Status
Subject Blohm & Voss BV 237 E658178 entity
Predicate instanceOf P0 FINISHED
Object ground-attack aircraft project C16232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ground-attack aircraft project
Context triple: [Blohm & Voss BV 237, instanceOf, ground-attack aircraft project]
  • A. bomber aircraft project
    A bomber aircraft project is a coordinated effort to design, develop, test, and produce an aircraft optimized for delivering explosive ordnance to ground or sea targets under specified operational requirements.
  • B. aerial bomb
    An aerial bomb is an explosive weapon designed to be dropped from aircraft to detonate on or near a target, causing destructive blast, fragmentation, or specialized effects.
  • C. unbuilt aircraft project chosen
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • D. prototype bomber aircraft
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • E. anti-submarine warfare aircraft program
    A coordinated initiative to design, develop, acquire, and sustain specialized aircraft, systems, and capabilities dedicated to detecting, tracking, and neutralizing submarine threats.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ee5bbfc4d08190a1b206d0ac3a1e8d completed April 26, 2026, 6:38 p.m.
Created at: April 26, 2026, 7:48 p.m.