Triple

T2607352
Position Surface form Disambiguated ID Type / Status
Subject United States federal power system E58692 entity
Predicate regulator P46 FINISHED
Object Federal Energy Regulatory Commission E82708 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Federal Energy Regulatory Commission | Statement: [United States federal power system, regulator, Federal Energy Regulatory Commission]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Federal Energy Regulatory Commission
Context triple: [United States federal power system, regulator, Federal Energy Regulatory Commission]
  • A. Federal Energy Regulatory Commission chosen
    The Federal Energy Regulatory Commission is an independent U.S. government agency that regulates the interstate transmission of electricity, natural gas, and oil, and oversees wholesale energy markets and related infrastructure.
  • B. Federal Energy Administration
    The Federal Energy Administration was a short-lived U.S. government agency created in the 1970s to manage national energy policy and respond to energy crises before its functions were absorbed into the Department of Energy.
  • C. Federal Power Commission
    The Federal Power Commission was an independent U.S. regulatory agency responsible for overseeing interstate electricity and natural gas markets before its functions were eventually transferred to successor agencies such as the Department of Energy and the Federal Energy Regulatory Commission.
  • D. U.S. Nuclear Regulatory Commission
    The U.S. Nuclear Regulatory Commission is the federal agency responsible for overseeing and ensuring the safe use of nuclear materials and facilities in the United States.
  • E. Bureau of Energy Resources
    The Bureau of Energy Resources is a U.S. State Department bureau responsible for advancing American energy security, foreign policy, and economic interests through international energy diplomacy and policy coordination.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac3523881909679750c9f8c2dec completed March 6, 2026, 9:44 p.m.
NER Named-entity recognition batch_69abd86769b88190935151a01c1ac855 completed March 7, 2026, 7:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69af83de926c81909e45160f9fc78799 completed March 10, 2026, 2:37 a.m.
Created at: March 6, 2026, 9:49 p.m.