Triple
T2607264
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Consolidated Builders, Inc. |
E58689
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering and construction contractor |
C8088
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering and construction contractor Context triple: [Consolidated Builders, Inc., instanceOf, engineering and construction contractor]
-
A.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
B.
bridge construction company
chosen
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
-
C.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
D.
infrastructure management company
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
E.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4ac3523881909679750c9f8c2dec |
completed | March 6, 2026, 9:44 p.m. |
Created at: March 6, 2026, 9:49 p.m.