Triple

T26033348
Position Surface form Disambiguated ID Type / Status
Subject Columbia University gym construction site in Morningside Park E647489 entity
Predicate instanceOf P0 FINISHED
Object controversial construction project C18730 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: controversial construction project
Context triple: [Columbia University gym construction site in Morningside Park, instanceOf, controversial construction project]
  • A. contentious case
    A contentious case is a legal dispute between opposing parties brought before a court or tribunal for adjudication on contested rights or obligations.
  • B. controversy chosen
    Controversy is a state of public disagreement or heated debate arising from conflicting opinions, values, or interpretations about a particular issue, event, or decision.
  • C. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • D. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • E. unfinished building project
    An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8b60e88190a3b26c4f0032a2c2 completed April 21, 2026, 1:41 p.m.
Created at: April 22, 2026, 9:06 a.m.