Triple

T26011771
Position Surface form Disambiguated ID Type / Status
Subject Hamilton Street Railway E646918 entity
Predicate primaryHub P394 FINISHED
Object MacNab Transit Terminal
MacNab Transit Terminal is the main downtown bus terminal in Hamilton, Ontario, serving as a central transfer point for the Hamilton Street Railway transit system.
E1704014 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MacNab Transit Terminal | Statement: [Hamilton Street Railway, primaryHub, MacNab Transit Terminal]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: MacNab Transit Terminal
Triple: [Hamilton Street Railway, primaryHub, MacNab Transit Terminal]
Generated description
MacNab Transit Terminal is the main downtown bus terminal in Hamilton, Ontario, serving as a central transfer point for the Hamilton Street Railway transit system.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e8aa65881909ca58918f29ab2a0 completed April 21, 2026, 1:41 p.m.
NER Named-entity recognition batch_69f605b5f34c8190880875cdd32ab051 completed May 2, 2026, 2:09 p.m.
NED1 Entity disambiguation (via context triple) batch_6a1107a52c888190912e1e8f3175660d completed May 23, 2026, 1:49 a.m.
NEDg Description generation batch_6a11090be01081909db2a95c6d3afda7 completed May 23, 2026, 1:55 a.m.
NED2 Entity disambiguation (via description) batch_6a11098d46308190a3df9e8a74041538 completed May 23, 2026, 1:57 a.m.
Created at: April 22, 2026, 9:02 a.m.