Triple
T2600417
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stearns Wharf |
E58328
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wooden pier |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wooden pier Context triple: [Stearns Wharf, instanceOf, wooden pier]
-
A.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
wooden footbridge
A wooden footbridge is a small, elevated pedestrian crossing made primarily of timber, designed to span obstacles such as streams, ditches, or uneven terrain.
-
C.
boathouse
A boathouse is a waterside structure designed for storing, sheltering, and maintaining boats and related equipment, often providing direct access to a lake, river, or sea.
-
D.
wooden pole
A wooden pole is a long, cylindrical piece of wood used primarily for support, boundary marking, or structural purposes in construction and outdoor settings.
-
E.
ornamental bridge
An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4ac14040819098b13f4a27d5c8ff |
completed | March 6, 2026, 9:44 p.m. |
Created at: March 6, 2026, 9:49 p.m.