Triple

T2597442
Position Surface form Disambiguated ID Type / Status
Subject Azov-Black Sea waterway system E58264 entity
Predicate instanceOf P0 FINISHED
Object waterway system C6053 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: waterway system
Context triple: [Azov-Black Sea waterway system, instanceOf, waterway system]
  • A. waterway network chosen
    A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
  • B. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • C. river basin
    A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
  • D. river
    A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
  • E. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac14040819098b13f4a27d5c8ff completed March 6, 2026, 9:44 p.m.
Created at: March 6, 2026, 9:49 p.m.