Triple
T25970418
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jakarta river system |
E645793
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban river network |
C6053
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban river network Context triple: [Jakarta river system, instanceOf, urban river network]
-
A.
urban watercourse
An urban watercourse is a natural or engineered channel of flowing water that runs through a city or town, shaped and managed by surrounding urban infrastructure and land use.
-
B.
waterway network
chosen
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
C.
river corridor
A river corridor is the linear landscape surrounding a river, including its channel, banks, floodplain, and adjacent habitats, through which water, sediment, organisms, and energy flow and interact.
-
D.
river structure
A river structure is any engineered or natural formation built in, on, or alongside a river to influence its flow, stability, navigation, or ecological function.
-
E.
river basin
A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e77e8768648190b27bb578f14bcb88 |
completed | April 21, 2026, 1:41 p.m. |
Created at: April 22, 2026, 8:50 a.m.