Triple

T25962153
Position Surface form Disambiguated ID Type / Status
Subject Mississippi Highway 178 E645567 entity
Predicate hasJunctionWith P1018 FINISHED
Object Mississippi Highway 23
Mississippi Highway 23 is a state highway in northeastern Mississippi that runs through rural areas of Itawamba and Monroe counties, connecting small communities near the Alabama state line.
E1785771 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi Highway 23 | Statement: [Mississippi Highway 178, hasJunctionWith, Mississippi Highway 23]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mississippi Highway 23
Triple: [Mississippi Highway 178, hasJunctionWith, Mississippi Highway 23]
Generated description
Mississippi Highway 23 is a state highway in northeastern Mississippi that runs through rural areas of Itawamba and Monroe counties, connecting small communities near the Alabama state line.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e85efc08190997da7fcf98bd300 completed April 21, 2026, 1:41 p.m.
NER Named-entity recognition batch_69f604c70f208190a8154d17108e47d9 completed May 2, 2026, 2:05 p.m.
NED1 Entity disambiguation (via context triple) batch_6a12e429880481909b189e689009be76 completed May 24, 2026, 11:42 a.m.
NEDg Description generation batch_6a12e4fbf9cc8190b5bbff117668f81a completed May 24, 2026, 11:46 a.m.
NED2 Entity disambiguation (via description) batch_6a12e5cfee048190a139532d8e125411 completed May 24, 2026, 11:49 a.m.
Created at: April 22, 2026, 8:47 a.m.