Triple
T25924123
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Leça Swimming Pools |
E653252
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | seaside bathing complex |
C22985
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: seaside bathing complex Context triple: [Leça Swimming Pools, instanceOf, seaside bathing complex]
-
A.
seaside facility
chosen
A seaside facility is a coastal establishment that provides services, amenities, or infrastructure for recreation, tourism, or marine-related activities along the shoreline.
-
B.
lagoon complex
A lagoon complex is an interconnected system of shallow coastal water bodies, channels, and associated landforms that together form a dynamic, semi-enclosed marine environment.
-
C.
public beach
A public beach is a coastal area owned and maintained by a government or community, freely accessible to the general public for recreation, relaxation, and shoreline activities.
-
D.
beach club
A beach club is a leisure-oriented establishment located by the seaside that offers amenities such as sun loungers, food and drink service, entertainment, and recreational activities for its members or guests.
-
E.
beachside attraction
A beachside attraction is a recreational or scenic feature located along a shoreline that draws visitors for leisure, entertainment, or sightseeing.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab3eb9b881909c1390690551f868 |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 8:35 a.m.