Triple

T258742
Position Surface form Disambiguated ID Type / Status
Subject John Hancock Center E5494 entity
Predicate instanceOf P0 FINISHED
Object high-rise building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-rise building
Context triple: [John Hancock Center, instanceOf, high-rise building]
  • A. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • B. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • C. building complex
    A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
  • D. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • E. lattice tower
    A lattice tower is a tall, open-framework structure made of intersecting metal or wooden members, designed to support loads such as antennas, power lines, or observation platforms.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2580a64ac8190ad76e34bb0715b5e completed Feb. 28, 2026, 2:50 a.m.
Created at: Feb. 28, 2026, 2:55 a.m.