Triple
T2586047
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | State Route 180 |
E58006
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object |
SR 180
SR 180 is a state highway designation used for specific numbered routes within a U.S. state's road network.
|
E279582
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 180 | Statement: [State Route 180, abbreviation, SR 180]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SR 180 Context triple: [State Route 180, abbreviation, SR 180]
-
A.
SR 18
SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
-
B.
SR 15
SR 15 is a state highway in Maine that runs through the city of Brewer and connects several communities in the region.
-
C.
SR 16
SR 16 is a state highway in Georgia that runs east–west across the central part of the state, connecting several towns and major routes.
-
D.
SR 143
SR 143 is a short Arizona state highway in the Phoenix metropolitan area that primarily serves as a connector between Interstate 10 and Phoenix Sky Harbor International Airport.
-
E.
SR 1
SR 1 is a major north–south state highway in Georgia that largely follows the route of U.S. Route 27 across the state.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 180 Triple: [State Route 180, abbreviation, SR 180]
Generated description
SR 180 is a state highway designation used for specific numbered routes within a U.S. state's road network.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: SR 180 Target entity description: SR 180 is a state highway designation used for specific numbered routes within a U.S. state's road network.
-
A.
SR 18
SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
-
B.
SR 15
SR 15 is a state highway in Maine that runs through the city of Brewer and connects several communities in the region.
-
C.
SR 16
SR 16 is a state highway in Georgia that runs east–west across the central part of the state, connecting several towns and major routes.
-
D.
SR 143
SR 143 is a short Arizona state highway in the Phoenix metropolitan area that primarily serves as a connector between Interstate 10 and Phoenix Sky Harbor International Airport.
-
E.
SR 1
SR 1 is a major north–south state highway in Georgia that largely follows the route of U.S. Route 27 across the state.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4ac019c8819094add11c46706e32 |
completed | March 6, 2026, 9:44 p.m. |
| NER | Named-entity recognition | batch_69abd3f6f6ac8190abff7b8b6ff3c023 |
completed | March 7, 2026, 7:29 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69af6581f6fc819099ea28ecbb0093d7 |
completed | March 10, 2026, 12:27 a.m. |
| NEDg | Description generation | batch_69af67bbd6048190aaa091e6ce8cdd23 |
completed | March 10, 2026, 12:37 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69af6839cd1c81909ef772cda4bd2f9c |
completed | March 10, 2026, 12:39 a.m. |
Created at: March 6, 2026, 9:49 p.m.