Triple

T2580142
Position Surface form Disambiguated ID Type / Status
Subject Decree on Land E57069 entity
Predicate instanceOf P0 FINISHED
Object Soviet land reform measure C1642 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Soviet land reform measure
Context triple: [Decree on Land, instanceOf, Soviet land reform measure]
  • A. Soviet economic policy
    Soviet economic policy refers to the centrally planned, state-controlled system that directed production, distribution, and investment according to government-determined goals rather than market forces, aiming to rapidly industrialize and achieve socialist objectives.
  • B. policy of the Soviet Union chosen
    The policy of the Soviet Union encompasses the ideological, political, economic, and foreign strategies implemented by the Soviet state to build and maintain a socialist system under one-party rule from 1917 to 1991.
  • C. soviet
    Soviet refers to anything related to the former Soviet Union (USSR), including its government, ideology, culture, or people associated with its socialist, one-party state system.
  • D. election in the Soviet Union
    An election in the Soviet Union was a state-controlled political process in which candidates, typically preselected by the Communist Party, were formally approved by voters in largely non-competitive, single-party ballots.
  • E. Soviet government position
    A Soviet government position is an official role within the political and administrative hierarchy of the USSR, responsible for implementing Communist Party policies and managing state functions at various levels.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4dca6481908c301f8e317396e7 completed March 6, 2026, 9:42 p.m.
Created at: March 6, 2026, 9:49 p.m.