Triple

T25783
Position Surface form Disambiguated ID Type / Status
Subject Key Bridge E515 entity
Predicate instanceOf P0 FINISHED
Object bridge C402 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge
Context triple: [Key Bridge, instanceOf, bridge]
  • A. suspension bridge chosen
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • B. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • C. river
    A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
  • D. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • E. parkway
    A parkway is a landscaped, often scenic roadway designed primarily for leisurely automobile travel, typically with limited access and separated from commercial development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a243b4ac2c8190b93c303df797b7b2 completed Feb. 28, 2026, 1:24 a.m.
Created at: Feb. 28, 2026, 1:34 a.m.