Triple
T25781256
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kuroshio Sea tank |
E649294
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public aquarium exhibit |
C3847
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public aquarium exhibit Context triple: [Kuroshio Sea tank, instanceOf, public aquarium exhibit]
-
A.
public aquarium
chosen
A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
-
B.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
C.
freshwater exhibit
A freshwater exhibit is a curated display environment that showcases aquatic plants, animals, and ecosystems found in rivers, lakes, streams, and wetlands.
-
D.
aquarium system
An aquarium system is an integrated setup of tanks, equipment, and controls designed to create and maintain a stable, healthy aquatic environment for fish, plants, and other organisms.
-
E.
aquarium design project series
A coordinated series of aquarium design projects that explore and develop cohesive aquatic environments through iterative planning, aesthetic composition, and functional habitat solutions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e7ab333b508190b6d708d8d9a328ed |
completed | April 21, 2026, 4:52 p.m. |
Created at: April 22, 2026, 5:38 a.m.