Triple

T2575171
Position Surface form Disambiguated ID Type / Status
Subject Consumer Confidence Reports E57758 entity
Predicate instanceOf P0 FINISHED
Object drinking water quality report C10570 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: drinking water quality report
Context triple: [Consumer Confidence Reports, instanceOf, drinking water quality report]
  • A. drinking water infrastructure
    Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
  • B. water source
    A water source is any natural or artificial origin from which water is obtained for ecological, domestic, agricultural, or industrial use.
  • C. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • D. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • E. water pollution control program
    A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a51410081908501dcf8bad9adc4 completed March 6, 2026, 9:42 p.m.
Created at: March 6, 2026, 9:48 p.m.