Triple

T2574430
Position Surface form Disambiguated ID Type / Status
Subject PCD E57741 entity
Predicate instanceOf P0 FINISHED
Object U.S. Army chemical weapons storage and destruction facility C828 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: U.S. Army chemical weapons storage and destruction facility
Context triple: [PCD, instanceOf, U.S. Army chemical weapons storage and destruction facility]
  • A. military installation
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • B. weapons-grade plutonium production facility
    A weapons-grade plutonium production facility is an industrial complex designed to produce, extract, and process plutonium with isotopic compositions suitable for use in nuclear weapons.
  • C. United States Army installation chosen
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • D. uranium enrichment facility
    A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
  • E. Superfund site
    A Superfund site is a contaminated location in the United States designated by the Environmental Protection Agency for long-term cleanup of hazardous substances and pollutants under the Superfund program.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a51410081908501dcf8bad9adc4 completed March 6, 2026, 9:42 p.m.
Created at: March 6, 2026, 9:48 p.m.