Triple

T257341
Position Surface form Disambiguated ID Type / Status
Subject Marine Corps War Memorial E5463 entity
Predicate constructionCompletedIn P1574 FINISHED
Object 1954 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1954 | Statement: [Marine Corps War Memorial, constructionCompletedIn, 1954]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionCompletedIn
Context triple: [Marine Corps War Memorial, constructionCompletedIn, 1954]
  • A. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • C. constructionSite
    Indicates that an entity is a location or area where construction work is actively taking place or is planned to occur.
  • D. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • E. completedIn chosen
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2580a64ac8190ad76e34bb0715b5e completed Feb. 28, 2026, 2:50 a.m.
NER Named-entity recognition batch_69a25d703e688190bb86c69527e306f5 completed Feb. 28, 2026, 3:13 a.m.
PD Predicate disambiguation batch_69a25b694c08819085bb4b256fa7736f completed Feb. 28, 2026, 3:05 a.m.
Created at: Feb. 28, 2026, 2:55 a.m.