Triple
T2572575
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Festival Management Committee |
E57697
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | event organizing committee |
C6550
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: event organizing committee Context triple: [Festival Management Committee, instanceOf, event organizing committee]
-
A.
organizational committee
chosen
An organizational committee is a structured group of individuals formally appointed within an organization to plan, coordinate, and oversee specific functions, projects, or decision-making processes.
-
B.
event producer
An event producer is an entity responsible for creating, organizing, and managing events by coordinating resources, logistics, and stakeholders to deliver a planned experience.
-
C.
event
An event is a distinct occurrence or happening, often bounded in time and space, that involves one or more participants and may trigger changes in state or behavior within a system.
-
D.
cooperative organizer
A cooperative organizer is an individual or system that coordinates people, resources, and processes to collaboratively plan, manage, and execute shared goals within a cooperative structure.
-
E.
event role
An event role is a conceptual class representing the specific function, responsibility, or participation type that an entity assumes within the context of a particular event.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4a51410081908501dcf8bad9adc4 |
completed | March 6, 2026, 9:42 p.m. |
Created at: March 6, 2026, 9:48 p.m.