Triple
T2572084
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | South Market |
E57686
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | market building |
C3744
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: market building Context triple: [South Market, instanceOf, market building]
-
A.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
B.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
-
C.
marketplace
A marketplace is a platform or environment where buyers and sellers interact to exchange goods, services, or information, typically governed by rules that facilitate transactions and determine value.
-
D.
indoor market
chosen
An indoor market is a covered commercial space where multiple vendors sell a variety of goods—such as food, crafts, and household items—to the public in a shared environment.
-
E.
office building complex
An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4a51410081908501dcf8bad9adc4 |
completed | March 6, 2026, 9:42 p.m. |
Created at: March 6, 2026, 9:48 p.m.