Triple

T25619177
Position Surface form Disambiguated ID Type / Status
Subject Her Majesty’s Theatre, Melbourne (refurbishment work) E642244 entity
Predicate instanceOf P0 FINISHED
Object building refurbishment project C5246 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: building refurbishment project
Context triple: [Her Majesty’s Theatre, Melbourne (refurbishment work), instanceOf, building refurbishment project]
  • A. architectural renovation project chosen
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • B. building alteration
    A building alteration is a modification or change to an existing structure’s design, layout, or components that does not constitute complete demolition or new construction.
  • C. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • D. building alteration phase
    The building alteration phase is the period in a building’s lifecycle during which modifications, renovations, or upgrades are planned and executed to change its structure, systems, or use without fully demolishing it.
  • E. architectural reconstruction project
    An architectural reconstruction project is a coordinated effort to research, design, and rebuild a damaged or lost structure to restore its historical, functional, or aesthetic integrity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e77e7a96748190b10f2699041e4e43 completed April 21, 2026, 1:41 p.m.
Created at: April 21, 2026, 5:02 p.m.