Triple

T25580315
Position Surface form Disambiguated ID Type / Status
Subject Grom-class destroyer E641222 entity
Predicate instanceOf P0 FINISHED
Object Polish Navy ship class C21111 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Polish Navy ship class
Context triple: [Grom-class destroyer, instanceOf, Polish Navy ship class]
  • A. Polish Navy ship chosen
    A Polish Navy ship is a naval vessel commissioned by Poland’s maritime armed forces, designed and equipped to perform military, patrol, support, and defense operations at sea under the Polish flag.
  • B. Pohjanmaa-class corvette
    The Pohjanmaa-class corvette is a Finnish multi-role warship class designed for year-round operations in the Baltic Sea, combining anti-surface, anti-air, and anti-submarine warfare capabilities with ice-strengthened hulls.
  • C. Soviet Navy cruiser
    A Soviet Navy cruiser is a large, fast, heavily armed warship designed by the Soviet Union for surface combat, air defense, and power projection at sea.
  • D. Soviet naval ship class
    A Soviet naval ship class is a group of warships built to a common design by the Soviet Union, sharing similar size, armament, technology, and intended operational roles within the Soviet Navy.
  • E. P-class destroyer
    A P-class destroyer is a fast, maneuverable naval warship designed primarily for escorting larger vessels, defending fleets from enemy ships and aircraft, and performing patrol and anti-submarine duties.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dc42b588190a98b58e0df359674 completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 4:11 p.m.