Triple

T25556478
Position Surface form Disambiguated ID Type / Status
Subject Manhattan Pipeline E640585 entity
Predicate instanceOf P0 FINISHED
Object pipeline construction company C50945 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pipeline construction company
Context triple: [Manhattan Pipeline, instanceOf, pipeline construction company]
  • A. road construction company
    A road construction company is an organization that plans, designs, builds, repairs, and maintains roads and related infrastructure for public and private clients.
  • B. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • C. construction technology company
    A construction technology company develops and provides digital tools, software, and innovative systems that improve the planning, design, management, and execution of construction projects.
  • D. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • E. construction and trading company
    A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e75dc101a881909fd33b02174e9768 completed April 21, 2026, 11:21 a.m.
Created at: April 21, 2026, 3:40 p.m.