Triple

T2552494
Position Surface form Disambiguated ID Type / Status
Subject Stonehenge E56657 entity
Predicate builtInPhases P40796 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Stonehenge, builtInPhases, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: builtInPhases
Context triple: [Stonehenge, builtInPhases, true]
  • A. phasesOut
    Indicates the process by which one entity or condition is gradually discontinued or removed in favor of another over time.
  • B. hasMultiplePhases
    Indicates that the related process, event, or activity occurs in more than one distinct phase or stage.
  • C. builtIn
    Indicates that one entity is inherently included as a standard, pre-existing component or feature of another entity, rather than being added or installed separately.
  • D. programPhase
    Indicates the specific stage or phase within a broader program or process that an entity is currently associated with.
  • E. mainPhase
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4bfec081908039988ec4c86e28 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abd5a33234819082ad49fa6594b6be completed March 7, 2026, 7:37 a.m.
PD Predicate disambiguation batch_69abd0c8b6f08190a68645db3e8b779a completed March 7, 2026, 7:16 a.m.
PDg Predicate description generation batch_69abd5a1cd508190a660b9a3c6b7cbcb completed March 7, 2026, 7:37 a.m.
Created at: March 6, 2026, 9:48 p.m.